Last additions - mahtek's Gallery |
Detail of the glue grooves and set screw holes in the joint body and pivot.587 viewsmahtekNov 10, 2007
|
|
Close up of joint with set screw alignment marks.618 viewsmahtekNov 10, 2007
|
|
Joint in place.746 viewsmahtekNov 10, 2007
|
|
Set screws aligned and tightened.845 viewsmahtekNov 10, 2007
|
|
Checking if the joint is set at the proper depth.750 viewsmahtekNov 10, 2007
|
|
Injecting the epoxy.767 viewsmahtekNov 10, 2007
|
|
Hip joint attached to the pelvic bracket with the four screws.753 viewsmahtekNov 10, 2007
|
|
Post Op. I'll leave the spreaders in for an hour or so to vent any fumes from the epoxy.2648 viewsmahtekNov 10, 2007
|
|
The proper placement of the thin bearing, and why the retaining plates won't work.601 viewsmahtekNov 08, 2007
|
|
The spine joint can be accessed from the side.789 viewsmahtekNov 05, 2007
|
|
Penelope, preped for surgery.950 viewsmahtekNov 04, 2007
|
|
Penelope's thigh, open at the seam.1055 viewsmahtekNov 04, 2007
|
|
Close up of joint failure. Notice how the pivot shaft is sliding out of the joint body.859 viewsmahtekNov 04, 2007
|
|
Penelope's thigh and pelvis after joint removal.758 viewsmahtekNov 04, 2007
|
|
The disassembled joint and all the tools used so far. The wrenches are 7/16 inch. Abyss uses this size throughout the doll.746 viewsmahtekNov 04, 2007
|
|
|
|
|
|
|
|
|
|
|
|
374 files on 15 page(s) |
|
|
|
|
|
7 | |
|
|
|
|
|
|
|